Bathroom with terrazzo countertop and floor, wooden cabinetry, round mirror, white vertical tile wall, and pink and yellow patterned wallpaper.

ADU & Conversion Design
In the San Francisco Bay ARea

Design-led ADUs and conversions that maximize efficiency, flexibility, and long-term usability. We provide strategic layout planning and documentation that supports Bay Area permitting, circulation clarity, and future adaptability.

How to work with Us

Step 1

Free Discovery Call

This brief call helps determine whether William Adams Design is the right fit for your ADU project. We’ll review your goals, scope, timeline, and the level of design support needed before outlining next steps.

Schedule Now

Step 2

Design Consultation

This consultation focuses on how your lifestyle functions today and how it needs to evolve. We’ll review scope, priorities, and any architectural considerations to provide clarity on next steps and whether we’re the right partner to move forward.

William Adams Process

Effortless steps for exceptional outcomes

1
Scope & Constraints
We begin by evaluating the existing structure, site conditions, zoning considerations, and long-term goals for the space. This phase clarifies feasibility, identifies limitations, and establishes a strategic framework before design decisions are made.
2
Design Development
With parameters defined, we develop efficient layouts and integrated design solutions that maximize usable square footage while supporting flexibility, circulation, and long-term functionality.
3
Documentation & Coordination
Once the design direction is finalized, detailed drawings are prepared to support permitting and construction. We coordinate documentation to ensure clarity, compliance, and a smooth transition into execution.
4
Design Approval
We check and track every project item, sharing a comprehensive finish guide with contractors. Each item is inspected, and we swiftly handle any on-site surprises, from returns or replacements to quantity adjustments.
5
Construction Kick-off
Demolition and construction kick off 2-4 weeks before the most extended lead time items arrive. WAD visits the site during framing, electrical, and plumbing, and periodically during finishing and installation to ensure the design is executed per our planning.
6
Final Walkthrough
We team up with your general contractor for a thorough walkthrough to check installations, finishing materials, and fixtures.

FAQs

How small can an ADU be?

Size minimums and maximums vary by municipality. Design must align with local code.

Can an ADU increase property value?

Well-designed ADUs often increase flexibility and potential rental income, contributing to long-term property value.

Do ADUs require permits?

In most cases, yes. Local zoning and building codes govern ADU development. Design documentation must align with these regulations.

Home & lifestyle Insights

Transform Your Home Into a Sanctuary of Wellness

Transform Your Home Into a Sanctuary of Wellness

Essential Design Tips for a Healthier Living Space
Read Now
The Emotional Symphony: How Colors Transform Your Luxury Home

The Emotional Symphony: How Colors Transform Your Luxury Home

Color is one of the most powerful design tools we have—and it goes far beyond aesthetics. It can ground you, lift your spirits, energize a room, or wrap it in calm.
Read Now
Continuing a Legacy of Interior Architecture

Continuing a Legacy of Interior Architecture

From a young age, I have cultivated a deep-rooted passion for architecture and design, a journey that feels almost predestined. Design is more than just a career for me—it’s a legacy I pridefully carry forward.
Read Now

Ready to Plan an ADU or Conversion?

Book a discovery call to discuss feasibility and goals.